Public education plan for stormwater pollution prevention, shared by the City of Midland, Midland County Drain Commissioner, Midland County Road Commission, and Lincoln Township. It lists target audiences, delivery methods, a schedule, an evaluation approach, and tables of key messages with measurable goals.

Summary written automatically. The full text below is the record.

Original PDF(174 KB)
Contents (7)

Collaborative Public Education Program (PEP)

Background

The objective of the Public Education Program (PEP) is to increase knowledge and change the behavior of the public so that pollutants in stormwater runoff are reduced. Distribution of educational materials or equivalent outreach is considered Best Management Practices (BMP) for the PEP procedures. Municipal Separate Storm Sewer System (MS4) permittees may work collaboratively with watershed or regional partners on any or all BMPs.

Responsible Party

The collaborative permittees are all responsible for ensuring implementation of the PEP. The collaborative permittees will implement and provide leadership on the public education activities listed in this plan. The collaborative permittees are the City of Midland, Midland County Drain Commissioner, Midland County Road Commission, and Lincoln Township.

Target Audience

Target audiences which will be reached are listed below.

  • General public/ residents
  • Educational institutions
  • Businesses
  • Employees
  • Contractors

Delivery Mechanisms

The delivery mechanisms are listed below, and the collaborative permittees will select appropriate mechanism(s) per educational topic.

  • Social media campaign
  • Display or presentation at in-person event
  • E-mail newsletter
  • Website
  • Brochure rack in high traffic location
  • Educational signage
  • Posters
  • Promote and/or participate in clean-up event(s) with educational component
  • Storm drain markers
  • Educational art installations
  • Pet waste disposal signage/baggy stations

Implementation Schedule

Quarterly, a minimum of one key message will be communicated through either social media or other similar selected delivery mechanism. All topics from the Public Education Topics and Implementation Plan section below will be covered at least once annually. Ongoing information will be provided on the website. Displays, presentations, and promotion of events will be completed as relevant events are scheduled.

Overall Evaluation

Once per permit term, a survey will be provided to the public to determine behavior changes or perceived impression of pollutant issues. The surveys will be gathered at the end of each permit term and added to the information collected from previous permit terms. Such measures are expected to include public comment and feedback and level of participation in programs and events. These mechanisms can be useful in determining whether the education effort is reaching the audience; however, it is difficult to evaluate behavior change resulting from the education activity using these purely quantitative methods. It is understood and stated by EGLE that these surveys do not necessarily need to be statistically validated. The collaborative permittees will re-evaluate this PEP and make necessary changes that will efficiently utilize resources and available funds.

Public Education Topics and Implementation Plan:

Each topic will be messaged annually as detailed in the tables below. Each collaborative permittee will be responsible for selecting the delivery mechanism that they feel will work best for them and the associated measurable goal will apply. A minimum of one delivery mechanism will be selected per key message.

Table 1: Educate the public on the following related to the stormwater discharges.
Key MessageTarget AudienceDelivery Mechanism OptionsMeasurable Goal per Delivery Mechanism
Connection of the MS4 to area waterbodies and potential impactsGeneral public/ residents Educational institutions Businesses Employees Contractors1. Social media campaign 2. Display or presentation at in-person event 3. Brochure rack in high traffic location 4. E-mail newsletter 5. Website 6. Posters 7. Storm drain markers1. Social media post receives 50 views 2. Display or presentation at one event 3. Ten brochures passed out 4. 20 clicks from newsletter to website 5. 100 unique views of the stormwater webpage 6. Post at least ten copies of the developed poster 7. Number of markers on catch basins
Public responsibility and stewardship in the applicant's watershed(s)General public/ residents Educational institutions Businesses Employees Contractors1. Social media campaign 2. Display or presentation at in-person event 3. Brochure rack in high traffic location 4. Website 5. Educational signage 6. Posters 7. Stream clean-up event with educational component 8. Storm drain markers 9. Pet waste disposal signage/baggy stations1. Social media post receives 50 views 2. Display or presentation at one event 3. Ten brochures passed out 4. 100 unique views of the stormwater webpage 5. Install/update watershed educational signage 6. Post at least ten copies of the developed poster 7. Promote one cleanup event 8. Number of markers on catch basins 9. Track approximate bag usage or install additional stations
Benefits of green infrastructure and low impact developmentGeneral public/ residents Educational institutions Businesses1. Social media campaign 2. Display or presentation at in-person event 3. Brochure rack in high traffic location 4. E-mail newsletter 5. Website 6. Educational signage1. Social media post receives 50 views 2. Display or presentation at one event 3. Ten brochures passed out 4. 20 clicks from newsletter to website 5. 100 unique views of the stormwater webpage 6. Install/update watershed educational signage
Table 2: Educate the public on the following related to illicit discharges.
Key MessageTarget AudienceDelivery Mechanism OptionsMeasurable Goal per Delivery Mechanism
Detection and elimination of illicit dischargesGeneral public/ residents Educational institutions Businesses Employees Contractors1. Social media campaign 2. Display or presentation at in-person event 3. Brochure rack in high traffic location 4. E-mail newsletter 5. Website 6. Posters 7. Storm drain markers 8. Educational art installations1. Social media post receives 50 views 2. Display or presentation at one event 3. Ten brochures passed out 4. 20 clicks from newsletter to website 5. 100 unique views of the stormwater webpage 6. Post at least ten copies of the developed poster 7. Number of markers on catch basins 8. Install one art installation
Public reporting of illicit dischargesGeneral public/ residents Educational institutions Businesses Employees Contractors1. Social media campaign 2. Display or presentation at in-person event 3. E-mail newsletter 4. Website 5. Posters1. Social media post receives 50 views 2. Display or presentation at one event 3. 20 clicks from newsletter to website 4. 100 unique views of the stormwater webpage 5. Post at least ten copies of the developed poster
Proper septic system care and maintenance and recognizing system failureGeneral public/ residents1. Social media campaign 2. Website 3. Posters1. Social media post receives 50 views 2. 100 unique views of the stormwater webpage 3. Post at least ten copies of the developed poster
Table 3: Educate the public on proper application of the following.
Key MessageTarget AudienceDelivery Mechanism OptionsMeasurable Goal per Delivery Mechanism
Deicing materialsGeneral public/ residents Educational institutions Businesses Employees Contractors1. Social media campaign 2. Brochure rack in high traffic location 3. E-mail newsletter 4. Website 5. Posters1. Social media post receives 50 views 2. Ten brochures passed out 3. 20 clicks from newsletter to website 4. 100 unique views of the stormwater webpage 5. Post at least ten copies of the developed poster
Table 3 (continued)
Key MessageTarget AudienceDelivery Mechanism OptionsMeasurable Goal per Delivery Mechanism
Pesticides/ herbicides/ fertilizersGeneral public/ residents Educational institutions Businesses Employees Contractors1. Social media campaign 2. Display or presentation at in-person event 3. Brochure rack in high traffic location 4. E-mail newsletter 5. Website 6. Posters1. Social media post receives 50 views 2. Display or presentation at one event 3. Ten brochures passed out 4. 20 clicks from newsletter to website 5. 100 unique views of the stormwater webpage 6. Post at least ten copies of the developed poster
Table 4: Educate the public on proper disposal of the following:
Key MessageTarget AudienceDelivery Mechanism OptionsMeasurable Goal per Delivery Mechanism
Grass clippings and leavesGeneral public/ residents Educational institutions Businesses Employees Contractors1. Social media campaign 2. Brochure rack in high traffic location 3. E-mail newsletter 4. Website 5. Posters 6. Storm drain markers1. Social media post receives 50 views 2. Ten brochures passed out 3. 20 clicks from newsletter to website 4. 100 unique views of the stormwater webpage 5. Post at least ten copies of the developed poster 6. Number of markers on catch basins
Pet wasteGeneral public/ residents1. Social media campaign 2. Brochure rack in high traffic location 3. E-mail newsletter 4. Website 5. Educational signage 6. Posters 7. Storm drain markers 8. Pet waste disposal signage/baggy stations1. Social media post receives 50 views 2. Ten brochures passed out 3. 20 clicks from newsletter to website 4. 100 unique views of the stormwater webpage 5. Install/update watershed educational signage 6. Post at least ten copies of the developed poster 7. Number of markers on catch basins 8. Track approximate bag usage or install additional stations
Household hazardous wasteGeneral public/ residents1. Social media campaign 2. E-mail newsletter 3. Website 4. Brochure rack in high traffic location1. Social media post receives 50 views 2. Ten brochures passed out 3. 20 clicks from newsletter to website 4. 100 unique views of the stormwater webpage
Table 4 (continued)
Key MessageTarget AudienceDelivery Mechanism OptionsMeasurable Goal per Delivery Mechanism
5. Posters 6. Storm drain markers5. Post at least ten copies of the developed poster 6. Number of markers catch basins
Commercial and industrial wasteBusinesses Employees Contractors1. Social media campaign 2. E-mail newsletter 3. Website 4. Brochure rack in high traffic location 5. Posters1. Social media post receives 50 views 2. Ten brochures passed out 3. 20 clicks from newsletter to website 4. 100 unique views of the stormwater webpage 5. Post at least ten copies of the developed poster
Educational and institutional wasteBusinesses Educational institutions1. Social media campaign 2. E-mail newsletter 3. Website 4. Brochure rack in high traffic location 5. Posters1. Social media post receives 50 views 2. Ten brochures passed out 3. 20 clicks from newsletter to website 4. 100 unique views of the stormwater webpage 5. Post at least ten copies of the developed poster