Public education plan for stormwater pollution prevention, shared by the City of Midland, Midland County Drain Commissioner, Midland County Road Commission, and Lincoln Township. It lists target audiences, delivery methods, a schedule, an evaluation approach, and tables of key messages with measurable goals.
Summary written automatically. The full text below is the record.
Contents (7)
Collaborative Public Education Program (PEP)
Background
The objective of the Public Education Program (PEP) is to increase knowledge and change the behavior of the public so that pollutants in stormwater runoff are reduced. Distribution of educational materials or equivalent outreach is considered Best Management Practices (BMP) for the PEP procedures. Municipal Separate Storm Sewer System (MS4) permittees may work collaboratively with watershed or regional partners on any or all BMPs.
Responsible Party
The collaborative permittees are all responsible for ensuring implementation of the PEP. The collaborative permittees will implement and provide leadership on the public education activities listed in this plan. The collaborative permittees are the City of Midland, Midland County Drain Commissioner, Midland County Road Commission, and Lincoln Township.
Target Audience
Target audiences which will be reached are listed below.
- General public/ residents
- Educational institutions
- Businesses
- Employees
- Contractors
Delivery Mechanisms
The delivery mechanisms are listed below, and the collaborative permittees will select appropriate mechanism(s) per educational topic.
- Social media campaign
- Display or presentation at in-person event
- E-mail newsletter
- Website
- Brochure rack in high traffic location
- Educational signage
- Posters
- Promote and/or participate in clean-up event(s) with educational component
- Storm drain markers
- Educational art installations
- Pet waste disposal signage/baggy stations
Implementation Schedule
Quarterly, a minimum of one key message will be communicated through either social media or other similar selected delivery mechanism. All topics from the Public Education Topics and Implementation Plan section below will be covered at least once annually. Ongoing information will be provided on the website. Displays, presentations, and promotion of events will be completed as relevant events are scheduled.
Overall Evaluation
Once per permit term, a survey will be provided to the public to determine behavior changes or perceived impression of pollutant issues. The surveys will be gathered at the end of each permit term and added to the information collected from previous permit terms. Such measures are expected to include public comment and feedback and level of participation in programs and events. These mechanisms can be useful in determining whether the education effort is reaching the audience; however, it is difficult to evaluate behavior change resulting from the education activity using these purely quantitative methods. It is understood and stated by EGLE that these surveys do not necessarily need to be statistically validated. The collaborative permittees will re-evaluate this PEP and make necessary changes that will efficiently utilize resources and available funds.
Public Education Topics and Implementation Plan:
Each topic will be messaged annually as detailed in the tables below. Each collaborative permittee will be responsible for selecting the delivery mechanism that they feel will work best for them and the associated measurable goal will apply. A minimum of one delivery mechanism will be selected per key message.
| Key Message | Target Audience | Delivery Mechanism Options | Measurable Goal per Delivery Mechanism |
|---|---|---|---|
| Connection of the MS4 to area waterbodies and potential impacts | General public/ residents Educational institutions Businesses Employees Contractors | 1. Social media campaign 2. Display or presentation at in-person event 3. Brochure rack in high traffic location 4. E-mail newsletter 5. Website 6. Posters 7. Storm drain markers | 1. Social media post receives 50 views 2. Display or presentation at one event 3. Ten brochures passed out 4. 20 clicks from newsletter to website 5. 100 unique views of the stormwater webpage 6. Post at least ten copies of the developed poster 7. Number of markers on catch basins |
| Public responsibility and stewardship in the applicant's watershed(s) | General public/ residents Educational institutions Businesses Employees Contractors | 1. Social media campaign 2. Display or presentation at in-person event 3. Brochure rack in high traffic location 4. Website 5. Educational signage 6. Posters 7. Stream clean-up event with educational component 8. Storm drain markers 9. Pet waste disposal signage/baggy stations | 1. Social media post receives 50 views 2. Display or presentation at one event 3. Ten brochures passed out 4. 100 unique views of the stormwater webpage 5. Install/update watershed educational signage 6. Post at least ten copies of the developed poster 7. Promote one cleanup event 8. Number of markers on catch basins 9. Track approximate bag usage or install additional stations |
| Benefits of green infrastructure and low impact development | General public/ residents Educational institutions Businesses | 1. Social media campaign 2. Display or presentation at in-person event 3. Brochure rack in high traffic location 4. E-mail newsletter 5. Website 6. Educational signage | 1. Social media post receives 50 views 2. Display or presentation at one event 3. Ten brochures passed out 4. 20 clicks from newsletter to website 5. 100 unique views of the stormwater webpage 6. Install/update watershed educational signage |
| Key Message | Target Audience | Delivery Mechanism Options | Measurable Goal per Delivery Mechanism |
|---|---|---|---|
| Detection and elimination of illicit discharges | General public/ residents Educational institutions Businesses Employees Contractors | 1. Social media campaign 2. Display or presentation at in-person event 3. Brochure rack in high traffic location 4. E-mail newsletter 5. Website 6. Posters 7. Storm drain markers 8. Educational art installations | 1. Social media post receives 50 views 2. Display or presentation at one event 3. Ten brochures passed out 4. 20 clicks from newsletter to website 5. 100 unique views of the stormwater webpage 6. Post at least ten copies of the developed poster 7. Number of markers on catch basins 8. Install one art installation |
| Public reporting of illicit discharges | General public/ residents Educational institutions Businesses Employees Contractors | 1. Social media campaign 2. Display or presentation at in-person event 3. E-mail newsletter 4. Website 5. Posters | 1. Social media post receives 50 views 2. Display or presentation at one event 3. 20 clicks from newsletter to website 4. 100 unique views of the stormwater webpage 5. Post at least ten copies of the developed poster |
| Proper septic system care and maintenance and recognizing system failure | General public/ residents | 1. Social media campaign 2. Website 3. Posters | 1. Social media post receives 50 views 2. 100 unique views of the stormwater webpage 3. Post at least ten copies of the developed poster |
| Key Message | Target Audience | Delivery Mechanism Options | Measurable Goal per Delivery Mechanism |
|---|---|---|---|
| Deicing materials | General public/ residents Educational institutions Businesses Employees Contractors | 1. Social media campaign 2. Brochure rack in high traffic location 3. E-mail newsletter 4. Website 5. Posters | 1. Social media post receives 50 views 2. Ten brochures passed out 3. 20 clicks from newsletter to website 4. 100 unique views of the stormwater webpage 5. Post at least ten copies of the developed poster |
| Key Message | Target Audience | Delivery Mechanism Options | Measurable Goal per Delivery Mechanism |
|---|---|---|---|
| Pesticides/ herbicides/ fertilizers | General public/ residents Educational institutions Businesses Employees Contractors | 1. Social media campaign 2. Display or presentation at in-person event 3. Brochure rack in high traffic location 4. E-mail newsletter 5. Website 6. Posters | 1. Social media post receives 50 views 2. Display or presentation at one event 3. Ten brochures passed out 4. 20 clicks from newsletter to website 5. 100 unique views of the stormwater webpage 6. Post at least ten copies of the developed poster |
| Key Message | Target Audience | Delivery Mechanism Options | Measurable Goal per Delivery Mechanism |
|---|---|---|---|
| Grass clippings and leaves | General public/ residents Educational institutions Businesses Employees Contractors | 1. Social media campaign 2. Brochure rack in high traffic location 3. E-mail newsletter 4. Website 5. Posters 6. Storm drain markers | 1. Social media post receives 50 views 2. Ten brochures passed out 3. 20 clicks from newsletter to website 4. 100 unique views of the stormwater webpage 5. Post at least ten copies of the developed poster 6. Number of markers on catch basins |
| Pet waste | General public/ residents | 1. Social media campaign 2. Brochure rack in high traffic location 3. E-mail newsletter 4. Website 5. Educational signage 6. Posters 7. Storm drain markers 8. Pet waste disposal signage/baggy stations | 1. Social media post receives 50 views 2. Ten brochures passed out 3. 20 clicks from newsletter to website 4. 100 unique views of the stormwater webpage 5. Install/update watershed educational signage 6. Post at least ten copies of the developed poster 7. Number of markers on catch basins 8. Track approximate bag usage or install additional stations |
| Household hazardous waste | General public/ residents | 1. Social media campaign 2. E-mail newsletter 3. Website 4. Brochure rack in high traffic location | 1. Social media post receives 50 views 2. Ten brochures passed out 3. 20 clicks from newsletter to website 4. 100 unique views of the stormwater webpage |
| Key Message | Target Audience | Delivery Mechanism Options | Measurable Goal per Delivery Mechanism |
|---|---|---|---|
| 5. Posters 6. Storm drain markers | 5. Post at least ten copies of the developed poster 6. Number of markers catch basins | ||
| Commercial and industrial waste | Businesses Employees Contractors | 1. Social media campaign 2. E-mail newsletter 3. Website 4. Brochure rack in high traffic location 5. Posters | 1. Social media post receives 50 views 2. Ten brochures passed out 3. 20 clicks from newsletter to website 4. 100 unique views of the stormwater webpage 5. Post at least ten copies of the developed poster |
| Educational and institutional waste | Businesses Educational institutions | 1. Social media campaign 2. E-mail newsletter 3. Website 4. Brochure rack in high traffic location 5. Posters | 1. Social media post receives 50 views 2. Ten brochures passed out 3. 20 clicks from newsletter to website 4. 100 unique views of the stormwater webpage 5. Post at least ten copies of the developed poster |