Application form
Mechanical Permit (Short Form)
Fill in this form below, then print it. Your answers are written onto the township’s original form, ready to sign by hand and mail or drop off. They stay on your device; nothing is sent until you hand in the form.
Contents (4)
LINCOLN TOWNSHIP
MECHANICAL PERMIT
Rev. 2/3/2026
I. Job Location
II. Contractor/Homeowner Information
III. Type of Job
VI. Fee Chart
Enter the number of items being installed, multiply by the unit price for total fee.
| DESCRIPTION | FEE | Number | TOTAL |
|---|---|---|---|
| Application Fee (No Refund) | $75.00 | 1 | $75.00 |
| Residential Heating System (includes duct and pipe) New Building Only | $55.00 | ||
| Gas/Oil Burning Equipment (Furnace, roof top units, generators) | $35.00 | ||
| Boiler | $35.00 | ||
| Water Heater gas piping & venting direct replacement | $7.00 | ||
| Flue/Vent Damper | $7.00 | ||
| Solid Fuel Equip (incl. Chimney) | $35.00 | ||
| Gas Burning Fireplace | $35.00 | ||
| Chimney, Factroy built (Installed separately) B Vent, PVC | $35.00 | ||
| Solar; set of 3 panels (includes piping) | $25.00 | ||
| Gas Piping; each opening - New installation (residential) | $7.00 | ||
| Air Conditioning - incl split Systems RTU - Cooling only | $35.00 | ||
| Heat Pumps; Complete Res. | $35.00 | ||
| Dryer, Bath & Kitchen Exhaust | $7.00 | ||
| Tanks: Aboveground | $25.00 | ||
| Aboveground Connection | $25.00 | ||
| Underground | $25.00 | ||
| Underground Connection | $25.00 | ||
| Humidifiers/Air Cleaners | $15.00 | ||
| All Piping (Minimum of $25.00) | |||
| Fuel Gas Piping | $30.00 | ||
| Process Piping | $30.00 | ||
| Hydronic Piping | $30.00 | ||
| Refrigeration Piping | $30.00 | ||
| Exhausters | $20.00 | ||
| Duct - minimum fee $30.00 | |||
| Heat Pumps; Commercial (pipe not included) | $25.00 | ||
| Air Handlers/Heat Wheels; *Under 10,000 Cfm | $25.00 | ||
| *Over 10,000 CFM | $60.00 | ||
| Commercial Hoods | $30.00 | ||
| Heat Recovery Unit | $12.00 | ||
| V.A.V. Boxes | $12.00 | ||
| Unit Ventilators | $12.00 | ||
| Unit Heaters (Terminal) | $17.00 | ||
| Fire Suppression / Protection | $70.00 | ||
| Fire Pump (each) | $125.00 | ||
| Sprinkler Heads: 1-10 | $90.00 | ||
| Sprinkler Heads: 11-20 | $125.00 | ||
| Sprikler Heads: 21-50 | $150.00 | ||
| Sprikler Heads: 51-100 | $210.00 | ||
| Sprinkler Heads: 101-200 | $300.00 | ||
| Sprinkler Heads: 201-300 | $390.00 | ||
| Sprinkler Heads: 301-400 | $510.00 | ||
| Sprinkler Heads: 401-500 | $600.00 | ||
| Sprinkler Heads: 501+ (.60 per head>501) | |||
| Standpipe system (each) | $60.00 | ||
| Standpipe hose outlet (each) | $10.00 | ||
| Alter/Modify existing system | $45.00 | ||
| Hood Suppression System | $125.00 | ||
| Flooding & Clean agent sys | $125.00 | ||
| Coils (Heat/Cool) | $35.00 | ||
| Refrigeration (Split System) | $35.00 | ||
| Chiller | $35.00 | ||
| Cooling Towers | $35.00 | ||
| Compressor/Condenser | $35.00 | ||
| Inspections: | |||
| Special insp. (pertaining to sale of building) | $60.00 | ||
| Additional Inspection | $75.00 | ||
| Inspection fee | $75.00 | 1 | $75.00 |
| Certification Fee | $20.00 | ||
| Total Fee (Must include the $150.00 for the non-refundable Application and final inspection fees) | |||
| TOTAL |
For inspection contact: Greg Younk, 2251 N. Eight Mile, Sanford, MI 48657, 989-687-7765
Done? Print the completed form, sign it, and hand it in.